Approvals · Stage 6 of 8
Your action
Nothing now
Last update
30 Aug 2026

Future stage · placeholders

Possession

The last steps of redevelopment: the building's Occupancy Certificate, the flat and parking draws, the snag list and the handover kit. None of them has started; this page explains each step so nothing is a surprise later.

  • FUTURE STAGE
  • CONSTRUCTION NOT STARTED

Sample data for Shree Harmony, a fictional society. Not a real record.

The possession steps

  1. Occupancy Certificate (OC)

    The municipal corporation certifies that the finished building may be lived in. No one takes possession before the OC is issued.

    Future stage
  2. Flat draw

    Final flats are allotted by the method the general body approves, for example a recorded draw among flats of the same entitlement. Today every new flat is a working allocation only.

    Future stage
  3. Parking draw

    Parking slots are allotted only after the sanctioned parking basis and the society's allocation method are recorded.

    Future stage
  4. Snag list

    You inspect your new flat with the developer and list every defect. The developer fixes them before you accept possession.

    Future stage
  5. Handover kit

    You receive your possession letter, keys and the documents for your flat and the building.

    Future stage

Flat and parking draw

Both draws happen only after the building is complete and the allocation method is approved. Until then, no flat or parking slot is final.

  • Flats allotted by draw

    0

    Working allocations only, awaiting sanction

  • WORKING CAPACITY

    18

    Target spaces in the fictional scheme

  • FINAL MEMBER SLOTS

    0

    Allocation deliberately disabled

Draw method approved by the general body
Not yet decided — future stage

Snag list

Snag list (placeholder)
FlatOpen itemsFixed itemsJoint inspection
No snag items yet: the new building has not been built.

Handover kit

What each member receives at possession. Nothing has been issued.

  • Possession letterNot issued
  • Keys and access cardsNot issued
  • Copy of the Occupancy CertificateNot issued
  • Your registered PAAA and final flat planNot issued
  • Warranties and appliance manualsNot issued
  • Building maintenance and emergency contactsNot issued