Member requests
Every request a member makes becomes a ticket with an owner, a status and a promise of when the member will hear back.
Sample data for Shree Harmony, a fictional society. Not a real record.
Tickets
Filter by owner
Filter by status
10 of 10 tickets shown
- INCLUDED IN WORKING SPEC
RQ-2026-001 · Architect
Washing-machine provision
Show the exact washing-machine water inlet, drain point and appliance location in the member layout.
Outcome so far Dedicated inlet + drain now shown as a working requirement.
- UNDER REVIEW
RQ-2026-002 · Architect
Stackable dryer space
Reserve usable space for a dryer above or beside the washing machine.
Outcome so far Space is reserved in the working specification; final clearance remains pending.
- WORKING DESIGN
RQ-2026-003 · Architect
AC outdoor-unit locations
Define external AC-unit zones with safe maintenance access and ventilation.
Outcome so far Common external service zone is being coordinated.
- OPEN
RQ-2026-004 · PMC
Parking dimensions
Show actual bay dimensions and access path before member-specific allocation.
Outcome so far Final parking matrix awaits sanctioned planning position.
- PROPOSED
RQ-2026-005 · Developer
Senior seating area
Provide a quiet common seating area suitable for elderly residents.
Outcome so far Included in the working amenity schedule; not yet confirmed.
- PROPOSED
RQ-2026-006 · Developer
EV charging readiness
Plan electrical capacity and practical provision for future EV charging.
Outcome so far Subject to electrical load and final parking configuration.
- ACCEPTED
RQ-2026-007 · Developer
PAAA annexures
Ensure the member plan, area statement and specification are attached and versioned with the final PAAA.
Outcome so far Tracked as a required member-document control item.
- UNDER REVIEW
RQ-2026-008 · Committee
Rent protection clarity
State when transit rent starts, escalation applies and payment protection becomes active.
Outcome so far Commercial terms are recorded; final member wording remains under review.
- ACCEPTED
RQ-2026-009 · PMC
Approval evidence
Do not mark IOD or sanctioned plans as received until the supporting document is available.
Outcome so far Portal status remains IOD awaited / sanctioned plan pending.
- IMPLEMENTED
RQ-2026-010 · Committee
Simple member summary
Show one clear answer telling members whether they need to do anything today.
Outcome so far “Your action today” is now a primary portal control.
No tickets match these filters.