Skip to content

Architectural working concept

The new building

This page presents a fictional architectural working concept so members can understand the intended building form. It is not a sanctioned plan. Floor count, services, parking, layouts and common areas remain subject to municipal approval and final technical coordination.

  • WORKING CONCEPT — NOT SANCTIONED
  • MEMBER LAYOUTS PROVISIONAL
  • FINAL SANCTION PENDING

Need to know

Status
Working design
What it means
Building information remains subject to the sanctioned plan and final technical documents.
Your action
Treat current drawings as planning information.

The full record, supporting detail and evidence remain available below.

Concept elevation

Harmony One

WORKING

  1. 12
  2. 11
  3. 10
  4. 09
  5. 08
  6. 07
  7. 06
  8. 05
  9. 04
  10. 03
  11. 02
  12. 01
  13. Podium 02
  14. Podium 01
  15. Ground / Arrival
  • 12 residential levels
  • 2 podium levels
  • Working massing only
  • Building form

    Single residential tower

    Working concept

  • Podium

    2 levels

    Parking + services concept

  • Residential levels

    12 floors

    Subject to sanction

  • Vertical transport

    3 lifts

    2 passenger + 1 service / stretcher concept

  • Fire strategy

    Protected stair + refuge

    Final fire approval pending

  • Member homes

    Replanned by entitlement

    Final layouts through sanctioned plan + PAAA

Design principles

  1. Member area protection

    Every final member flat should reconcile with the approved entitlement and executed member agreement.

  2. Life safety first

    Fire access, refuge, stairs, lift strategy and emergency systems take precedence over cosmetic planning.

  3. Serviceability

    Water, drainage, electrical, refuse, maintenance and equipment access should be coordinated before finalisation.

  4. Evidence before certainty

    Only sanctioned drawings and executed documents should be treated as final member-facing evidence.

Ask Nirmaan