Skip to content

Your home in the redevelopment

My Flat

This page shows a fictional member-specific flat record. The new-flat details are a working allocation only until the sanctioned plan and executed member agreement confirm them.

  • Existing flat B-07
  • 2 BHK
  • WORKING ALLOCATION

My flat

Need to know

Status
Working allocation
What it means
Your new-flat details are not final until sanctioned plans and the executed PAAA confirm them.
Your action
No action required today.

The full record, supporting detail and evidence remain available below.

  • Existing carpet area

    612 sq ft

    Demo verified existing-area basis

  • Working new flat

    H-803

    8th floor · 2.5 BHK

  • Plan status

    Awaiting sanction

    Do not treat the working plan as final

Area comparison

The portal keeps MOFA and RERA figures separate rather than mixing the two area definitions.

Existing carpet

612

sq ft · current flat

Working new MOFA

790

sq ft · subject to final documents

Flat record

A single place for the member-specific redevelopment details.
Existing flat
B-07 · 2 BHK
Working new flat
H-803 · 2.5 BHK
Working floor
8th floor
MOFA area
790 sq ft
RERA area
848 sq ft
Parking
NOT YET ALLOCATED
Plan evidence
AWAITING SANCTION

Private member specification

Inside the flat

This fictional member specification sheet shows how the portal can organise room planning, finishes, utilities and service requirements. Final dimensions, brands and locations should follow the sanctioned plan, approved specification and executed member documents.

  • WORKING MEMBER SPECIFICATION
  • FINAL LAYOUT PENDING
  • MEP COORDINATION PENDING

Need to know

Status
Working specification
What it means
Interior specifications are being tracked, but final member-document wording still governs.
Your action
Review the final specification annexure when issued.

The full record, supporting detail and evidence remain available below.

  • Living + dining

    Open-plan concept

    Final dimensions pending sanctioned layout

  • Primary bedroom

    Full-size bedroom

    Wardrobe wall reserved in working layout

  • Bedroom 02

    Full-size bedroom

    Window / AC coordination remains technical

  • Flex room

    Study / compact bedroom

    2.5 BHK working allocation only

  • Kitchen

    Parallel counter concept

    Utility services subject to final coordination

  • Bathrooms

    2 bathrooms

    Waterproofing and sanitary schedule to be finalised

Utilities & appliance planning

The details members usually need clarified before layouts are frozen.
Washing machine
Dedicated inlet + drain WORKING
Stackable dryer
Space reserved above / beside WM PROPOSED
Kitchen gas
Piped-gas provision subject to project service plan WORKING
AC outdoor units
Commonly coordinated external service zone WORKING
Water heater
Electrical / plumbing points to final MEP schedule WORKING
Internet / data
Concealed data provision concept PROPOSED

Member checks before sign-off

A simple checklist for items that are easy to miss in a redevelopment layout.
  1. Exact room dimensions must match the final sanctioned member layout.

  2. Washing-machine water inlet, drain point and dryer clearance should be explicitly coordinated.

  3. AC outdoor-unit positions should be defined without blocking ventilation or maintenance access.

  4. Electrical, plumbing and data points should be checked against furniture and appliance use before final sign-off.

  • Flooring

    Large-format vitrified tile

    PROPOSED SPEC
  • Internal doors

    Engineered flush doors

    PROPOSED SPEC
  • Windows

    Powder-coated aluminium system

    WORKING SPEC
  • Kitchen platform

    Quartz / equivalent working spec

    PROPOSED SPEC
  • Bathroom fittings

    Premium branded-equivalent range

    PROPOSED SPEC
  • Electrical

    Concealed wiring + modular switches

    WORKING SPEC

Member parking record

Parking

The current parking layout is a fictional working proposal. Member-specific parking can only be treated as final after the sanctioned building plan, final parking matrix and Society allocation process are recorded.

  • NOT YET ALLOCATED
  • WORKING SCHEME
  • AWAITING SANCTION

Need to know

Status
Not allocated
What it means
The current parking scheme is still a working proposal, not a member allotment.
Your action
No action required today.

The full record, supporting detail and evidence remain available below.

  • Conventional podium

    12

    Working count only

  • Mechanised

    6

    Subject to technical approval

  • Total member spaces

    18

    Target in the working scheme

How allocation becomes final

Four evidence steps separate a working parking concept from a member-specific slot.
  1. Plan

    Municipal / sanctioned plan confirms the permissible parking configuration.

  2. Matrix

    Architect and PMC issue the final parking matrix with dimensions and access paths.

  3. Society method

    Society confirms the member-allocation method and any eligibility rules.

  4. Member allocation

    Member-specific slot numbers are recorded in the portal and supporting document.

Your current parking record

The portal keeps confirmed facts separate from unresolved allocation details.
Demo member
Existing flat B-07
Current entitlement status
To be confirmed in final documents
Working slot number
None allocated
Parking type
Not final
Evidence status
PROPOSED / AWAITING SANCTION

NOT A FINAL ALLOCATION

Ask Nirmaan