This page shows a fictional member-specific flat record. The new-flat details are a working allocation only until the sanctioned plan and executed member agreement confirm them.
- Existing flat B-07
- 2 BHK
- WORKING ALLOCATION
My flat
Need to know
- Status
- Working allocation
- What it means
- Your new-flat details are not final until sanctioned plans and the executed PAAA confirm them.
- Your action
- No action required today.
The full record, supporting detail and evidence remain available below.
Existing carpet area
612 sq ft
Demo verified existing-area basis
Working new flat
H-803
8th floor · 2.5 BHK
Plan status
Awaiting sanction
Do not treat the working plan as final
Area comparison
The portal keeps MOFA and RERA figures separate rather than mixing the two area definitions.
Existing carpet
612
sq ft · current flat
Working new MOFA
790
sq ft · subject to final documents
Flat record
A single place for the member-specific redevelopment details.
- Existing flat
- B-07 · 2 BHK
- Working new flat
- H-803 · 2.5 BHK
- Working floor
- 8th floor
- MOFA area
- 790 sq ft
- RERA area
- 848 sq ft
- Parking
- NOT YET ALLOCATED
- Plan evidence
- AWAITING SANCTION
Private member specification
Inside the flat
This fictional member specification sheet shows how the portal can organise room planning, finishes, utilities and service requirements. Final dimensions, brands and locations should follow the sanctioned plan, approved specification and executed member documents.
- WORKING MEMBER SPECIFICATION
- FINAL LAYOUT PENDING
- MEP COORDINATION PENDING
Need to know
- Status
- Working specification
- What it means
- Interior specifications are being tracked, but final member-document wording still governs.
- Your action
- Review the final specification annexure when issued.
The full record, supporting detail and evidence remain available below.
Living + dining
Open-plan concept
Final dimensions pending sanctioned layout
Primary bedroom
Full-size bedroom
Wardrobe wall reserved in working layout
Bedroom 02
Full-size bedroom
Window / AC coordination remains technical
Flex room
Study / compact bedroom
2.5 BHK working allocation only
Kitchen
Parallel counter concept
Utility services subject to final coordination
Bathrooms
2 bathrooms
Waterproofing and sanitary schedule to be finalised
Utilities & appliance planning
The details members usually need clarified before layouts are frozen.
- Washing machine
- Dedicated inlet + drain WORKING
- Stackable dryer
- Space reserved above / beside WM PROPOSED
- Kitchen gas
- Piped-gas provision subject to project service plan WORKING
- AC outdoor units
- Commonly coordinated external service zone WORKING
- Water heater
- Electrical / plumbing points to final MEP schedule WORKING
- Internet / data
- Concealed data provision concept PROPOSED
Member checks before sign-off
A simple checklist for items that are easy to miss in a redevelopment layout.
Exact room dimensions must match the final sanctioned member layout.
Washing-machine water inlet, drain point and dryer clearance should be explicitly coordinated.
AC outdoor-unit positions should be defined without blocking ventilation or maintenance access.
Electrical, plumbing and data points should be checked against furniture and appliance use before final sign-off.
Flooring
Large-format vitrified tile
PROPOSED SPECInternal doors
Engineered flush doors
PROPOSED SPECWindows
Powder-coated aluminium system
WORKING SPECKitchen platform
Quartz / equivalent working spec
PROPOSED SPECBathroom fittings
Premium branded-equivalent range
PROPOSED SPECElectrical
Concealed wiring + modular switches
WORKING SPEC
Member parking record
Parking
The current parking layout is a fictional working proposal. Member-specific parking can only be treated as final after the sanctioned building plan, final parking matrix and Society allocation process are recorded.
- NOT YET ALLOCATED
- WORKING SCHEME
- AWAITING SANCTION
Need to know
- Status
- Not allocated
- What it means
- The current parking scheme is still a working proposal, not a member allotment.
- Your action
- No action required today.
The full record, supporting detail and evidence remain available below.
Conventional podium
12
Working count only
Mechanised
6
Subject to technical approval
Total member spaces
18
Target in the working scheme
How allocation becomes final
Four evidence steps separate a working parking concept from a member-specific slot.
Plan
Municipal / sanctioned plan confirms the permissible parking configuration.
Matrix
Architect and PMC issue the final parking matrix with dimensions and access paths.
Society method
Society confirms the member-allocation method and any eligibility rules.
Member allocation
Member-specific slot numbers are recorded in the portal and supporting document.
Your current parking record
The portal keeps confirmed facts separate from unresolved allocation details.
- Demo member
- Existing flat B-07
- Current entitlement status
- To be confirmed in final documents
- Working slot number
- None allocated
- Parking type
- Not final
- Evidence status
- PROPOSED / AWAITING SANCTION
NOT A FINAL ALLOCATION